Home /
To enhance the efficiency of electrical systems, especially in industrial and commercial settings, power factor correction has to be done. Businesses can achieve an optimal energy cost and system performance by resolving reactive power. Some of the best practices include: regular checking of the power factor ranges, use of suitable devices to correct the power factor and performing detailed energy audits. Sinotech Group has competent consultants to assist their clients in successfully implementing these practices while conforming to international requirements, thereby increasing operational efficiency.